Clifton Hill Railway Project

Click to enlarge
The rail bridge runs above the Merri Creek and the cycling path.

The rail bridge runs above the Merri Creek and the cycling path. Image: Andrew Lloyd

1 of 16
The view from High Street, Northcote to the pedestrian and cycling paths below.

The view from High Street, Northcote to the pedestrian and cycling paths below. Image: Andrew Lloyd

2 of 16
Bridge Park, situated under the railway bridge, includes a basketball court, hang out rocks and mounded asphalt for skateboarders.

Bridge Park, situated under the railway bridge, includes a basketball court, hang out rocks and mounded asphalt for skateboarders. Image: Andrew Lloyd

3 of 16
Balustrade fencing sits above a gambion wall.

Balustrade fencing sits above a gambion wall. Image: Andrew Lloyd

4 of 16
The steep gradient ruled out ramp access so the staircase incorporates a groove on its edge to make transporting bikes easier.

The steep gradient ruled out ramp access so the staircase incorporates a groove on its edge to make transporting bikes easier. Image: Andrew Lloyd

5 of 16
View of south bank from High Street Bridge. Environmental management measures were strictly undertaken and observed during construction.

View of south bank from High Street Bridge. Environmental management measures were strictly undertaken and observed during construction. Image: Jeavons Landscape Architects

6 of 16
South bank path intersection - Gradients were carefully calculated, seamlessly integrating  access from High Street, Merri Creek Trail & Clifton Hill.

South bank path intersection - Gradients were carefully calculated, seamlessly integrating access from High Street, Merri Creek Trail & Clifton Hill. Image: Andrew Lloyd

7 of 16
Landing lookout under the railway line -Early morning shadows on the generous stair landing at key south bank side junction.

Landing lookout under the railway line -Early morning shadows on the generous stair landing at key south bank side junction. Image: Andrew Lloyd

8 of 16
New staircase from Merri Creek valley up to Clifton Hill. Before the project was constructed locals would scramble up a steep goat track and climb through railway fencing.

New staircase from Merri Creek valley up to Clifton Hill. Before the project was constructed locals would scramble up a steep goat track and climb through railway fencing. Image: Andrew Lloyd

9 of 16
Ecological restoration has been wildly successful. Clematis microphylla scrambles up and over gabions and Corten. Shade trees will improve urban amenity and reduce heat island effect.

Ecological restoration has been wildly successful. Clematis microphylla scrambles up and over gabions and Corten. Shade trees will improve urban amenity and reduce heat island effect. Image: Andrew Lloyd

10 of 16
Bridge Park - This space was converted from a derelict site which was closed to the public.  Powerlines have been undergrounded; weed species removed and grassy woodland vegetation restored.

Bridge Park - This space was converted from a derelict site which was closed to the public. Powerlines have been undergrounded; weed species removed and grassy woodland vegetation restored. Image: Jeavons Landscape Architects

11 of 16
Bridge Park - grungy grandeur and filtered light - Spaces between piers form ‘urban rooms’  with varying treatments (seat rocks, games, basketball, skating).  Biodiverse planting frames the space outside the bridge.

Bridge Park - grungy grandeur and filtered light - Spaces between piers form ‘urban rooms’ with varying treatments (seat rocks, games, basketball, skating). Biodiverse planting frames the space outside the bridge. Image: Jeavons Landscape Architects

12 of 16
Feature planting detail  - Recycled rail tracks infilled with ballast and indigenous grasses, references the railway context and enhances wild industrial aesthetic.

Feature planting detail - Recycled rail tracks infilled with ballast and indigenous grasses, references the railway context and enhances wild industrial aesthetic. Image: Andrew Lloyd

13 of 16
Urquhart Street bridge underpass - Bluestone retaining walls and simple railing fence created an attractive solution to maintaining public safety by limiting access to rail tracks. This treatment blends well with the residential street context.  Bluestone was specified as Urquhart street is under a heritage overlay.

Urquhart Street bridge underpass - Bluestone retaining walls and simple railing fence created an attractive solution to maintaining public safety by limiting access to rail tracks. This treatment blends well with the residential street context. Bluestone was specified as Urquhart street is under a heritage overlay. Image: Andrew Lloyd

14 of 16
An early concept sketch of Bridge Park.

An early concept sketch of Bridge Park.

15 of 16
Clifton Hill Railway project site plan.

Clifton Hill Railway project site plan.

16 of 16

A new rail bridge coupled with pedestrian paths in Melbourne’s Clifton Hill has helped Jeavons Landscape Architects transform a formerly grimy space into a public park that’s “a bit cool, a bit grand.”

Something significant happened when the Department of Transport built a new bridge over the Merri Creek, duplicating the rail line between Melbourne’s inner-city stations of Clifton Hill and Westgarth. The landscape below and around the bridge – cyclist and pedestrian connections, careful revegetation, and the beneath-bridge play space of Bridge Park – won Jeavons Landscape Architects AILA Victoria’s 2011 Urban Design award.

The handsome new rail bridge (by McGauran Giannini Soon) runs adjacent to the existing heritage listed rail bridge, and reprises the form and materiality of its brick piers in brick-clad concrete. At Bridge Park, on the north side of the creek, these piers create a series of spaces running about eighty metres from a small street down to the creek. A long, uninterrupted view slots between the two runs of piers across the creek to the Capital City Trail and connections up the revegetated creek escarpment.

Bridge Park has a casual, rough and inviting feel. What was formerly an oppressive and grimy space has become light, open, of interest, a bit cool, a bit grand. Terraces with concrete retaining walls for grinding and seating, a surprise urban topography of rolling asphalt, a basketball half-court and game markings, good graffiti, then large rocks for seating, lead down to the banks of the Merri. New housing, on one of inner Melbourne’s only gravel roads, surveys the scene. The architects’ sculpted render on the piers takes hip inspiration from tagged letterforms, and text in informal script tells the story of a rail line “from nowhere to nowhere.”

Bridge Park, situated under the railway bridge, includes a basketball court, hang out rocks and mounded asphalt for skateboarders. Image:  Andrew Lloyd

That the scale of the landscape elements doesn’t stack up to the monumental piers, and that a platform that could have been a stage is too small, and that more could have been done for skaters and bikers, and that the whole lacks a little orchestration, matters less in this design than it might elsewhere. How do you design for an attractive awkwardness? Bridge Park is an in-between space, and its success and popularity is achieved through what it is not – park, skate park, play space, manicured, civic, formal. Beneath this rail infrastructure, it is strategically well considered.

The larger urban area on the south side of the creek is a tangle of overpasses and underpasses, diverging rail lines, and awkward connections. It was around here, in 1987, that Julian Knight slew seven people, an event commemorated on Hoddle Street in a beautiful memorial visible only to those who know. Twenty-five years later, the urban design of this project at last begins to open up that tangled space, through a simple east-side connection between Clifton Hill Station and the creek that takes movement away from the stark inhospitality of Hoddle Street.

The staircase that descends from Coulson Reserve, and from that new connection, is a pleasure in its materiality and detailing. Long, broken-ended, bluestone flags have been recycled into vertical cladding, bringing roughness and the basalt cliff geomorphology to the design. Perforated weathering steel panels bend around corners and add their roughness. Gabions filled with basalt ballast terrace the embankment. Levels have been carefully calculated to allow for a future ramp from the reserve and to make the steep embankment easy to traverse. At the top, a seat provides a fine view (as empties attest). Halfway down a platform is a simple, well-positioned resting area. Revegetation is extensive, returning pre-settlement ecologies to the area, with the escarpments carrying mostly shrubs and ground covers, the creek edges the bulk of the tree plantings. Around intersections, plantings have been kept low for visibility.

The Department of Transport entered into this project with great openness to the broader potential. All the stakeholders – Melbourne Water, the City of Yarra, the City of Darebin, bicycle user groups, community groups – worked together to create a rich outcome. This could have been just a bridge, and here it is so much more – a landscape for the public, not just their transport.